The blocks were produced at Tarmac´s Tallington factory and about 700 kg of CRC binder was used per m
3 of concrete. Mean compressive strength measured at 28 days was 139.0 MPa on the project.
Recently - in a period from April to November 2009 - Ebor Concrete has produced 584 blocks (300 m3) of CRC for relining of the manshaft at Boulby, a mine owned by Cleveland Potash Limited.