In this case failure occurred as yielding of the reinforcement, and in fact in all the tests failure occurred either as yielding or as failure in the parent concrete. In each case failure load was considerably higher than the design load and the behaviour under service loads was satisfactory.
The project has been supervised by a Steering Group made up of members of industry to ensure that the solutions tested are practical and readily useable in real structures.
It is the intention of the Steering Group to follow up the preliminary report with enough elaboration with regard to construction and design issues that a "Best Practice Guide" can be issued by BRE, giving examples of how a number of generic joints can be carried out.